PDRI for Mining Projects

The PDRI for Mining template addresses complexities specific to new (greenfield) mining projects including considerations for remote locations with limited infrastructure, uncertainty of site conditions, geo-political risk, and environmental constraints.

Mining projects include structures above ground and under ground. In addition, the site often requires development of infrastructure (roads, shelter, utilities, etc.) for workers, and for transportation of materials (railways, pipelines, etc.).

Key Characteristics

CharacteristicMining
Primary DesignerMining, geotechnical, civil,
mechanical, electrical, process,
industrial
Project OrientationVertical and horizontal
Interface with PublicExtensive
Environmental ImpactExtensive
Primary CostGeological investigation, earthworks, mechanical equipment, associated structures
Installed Equipment CostExtensive
Land Cost High
Jurisdiction Interface Extensive

Reference: “Project Definition Rating Index for Mining Projects,” Final Report: FR-366, Construction Industry Institute, 2020


Top Ten Elements

pdri for mining projects top weighted elements